FM Strategies & Solutions from Building Operating Management
Air-cooled chillers in days, not weeks.              
Email not displaying correctly?
View it in your browser.
-
When their chiller went down in December, a church on a tight budget in Baltimore took the time to get multiple bids for a replacement and considered them carefully. Then a few hot days in April brought the realization that they couldn’t wait eight to ten weeks for a new chiller. Fortunately, their contractor knew that a Quantech™ chiller would meet their needs now and in the future — and would arrive in days.

The order was placed on a Monday; the chiller was pulled from inventory, loaded on a truck and delivered on Friday. Four days from order to on-site arrival of the unit.
 
When time is short and the heat is on, you can still get the features, efficiency and capacity you want, delivered in two to five business days.

 

Quantech Air-Cooled Chillers

  • QTC2 15-50 TR air-cooled scroll chiller
  • QTC3 55-175 TR air-cooled scroll chiller
  • QTC4 160-210 TR air-cooled VSD screw chiller 
Fast  
  Delivery in two to five business days
  Faster installation and commissioning with native communications protocols
Efficient  
  Meets or exceeds ASHRAE 90.1-2013
  18 to 50% annual energy cost savings
  Low refrigerant charge helps earn Refrigerant Management LEED credit
  Lower lifecycle costs
Dependable  
  Smaller, lighter, quieter and low-maintenance
  A track record of exceptional reliability, the result of over 140 years of engineering excellence
 



Find out more at www.quantech-hvac.com.

Quantech logo

Information courtesy of Johnson Controls, Inc.
impressions